Draft EIR-
Coastal Transportation Corridor Specific Plan and West Los Angeles Transportation Improvement and Mitigation Specific Plan (CTCSP/WLA TIMP) – Specific Plans Amendment Project
Full Draft EIR
1.0 – Introduction
2.0 – Executive Summary
3.0 – Project Description
4.0 – Introduction to Environmental Impacts
4.1 – Air Quality
4.2 – Biological Resources
4.3 – Greenhouse Gas Emissions
4.4 – Land Use and Planning
4.5 – Noise and Vibration
4.6 – Transportation
5.0 – Other CEQA Considerations
6.0 – Alternatives
7.0 – References and List of Acronyms
8.0 – List of Preparers
Appendices
Appendix A – Proposed Specific Plan Amendments [Part 1 of 2]
Appendix A – Proposed Specific Plan Amendments (Livable Boulevards Streetscape Plan) [Part 2 of 2]
Appendix B – TIA Fee Study
Appendix C – Notice of Preparation /Scoping
Appendix D – Air Quality/Greenhouse Gas Emissions
Appendix E – Noise and Vibration
Appendix F – Model Development Report
Appendix G – Analysis of Project Impacts Compared to Existing Conditions
Appendix H – Updated Community Plan Text