DRAFT ENVIRONMENTAL IMPACT REPORT
For The
WILSHIRE COMSTOCK PROJECT
LEAD AGENCY: CITY OF
CASE No: ENV-2003-5313-EIR
SCH No: 2004091031
SITE LOCATION:
Draft Environmental Impact Report Table of
Contents of Graphics Exhibits
All graphics
files are provided as Adobe Acrobat Portable Document Format (PDF) files.
Click here to view the Table of Contents for the
Text Sections and Appendices
Figure II-1 Regional Map
(60k)
Figure II-2 Project Location
Map (27k)
Figure II-3 West Los Angeles
Transportation Improvement and Mitigation Specific Plan (83k)
Figure II-4 Wilshire-Westwood
Scenic Corridor Specific Plan (51k)
Figure II-5 Aerial Photograph
(293k)
Figure II-6 Photograph
Location Map (31k)
Figure II-7 Site
Photographs of the Project Site, Views A & B (335k)
Figure II-8 Site
Photographs of the Project Site, Views C & D (194k)
Figure II-9 Site
Photographs of the Project Site, Views E, F & G (240k)
Figure II-10 Site
Photographs of the Project Site, Views H & I (226k)
Figure II-11 Site
Photographs of the Project Site, Views J & K (243k)
Figure II-12 Site
Photographs of the Project Site, Views L & M (252k)
Figure II-13 Site
Photographs of the Project Site, Views N & O (230k)
Figure II-14 Related
Projects Location Map (505k)
Figure III-1 Proposed
Site Plan: 1st Floor Plan (248k)
Figure III-2 Proposed
Site Plan: 2nd Floor Plan (137k)
Figure III-3 Proposed
Site Plan: 3-5th Floor Plan (90k)
Figure III-4 Proposed
Site Plan: 6-10th Floor Plan (119k)
Figure III-5 Proposed
Site Plan: 11-15th Floor Plan (81k)
Figure III-6 Proposed
Site Plan: 16-18th Floor Plan (72k)
Figure III-7 Proposed
Site Plan: 19-20th Floor Plan (164k)
Figure III-8 Proposed
Site Plan: 21st Floor Plan (150k)
Figure III-9 Proposed Site Plan: Roof Plan
(126k)
Figure III-10 P1 Floor Plan (667k)
Figure III-11 P2 Floor Plan (362k)
Figure III-12 P3 Floor Plan (303k)
Figure III-13 North and South
Elevations (182k)
Figure III-14 East and West
Elevations (175k)
Figure III-15 Project Detail 1 (14.6M)
Figure III-16 Project Detail 2 (10.5M)
Figure III-17 Project Detail 3 (5.0M)
Figure III-18 Proposed Landscape
Plan (4.3M)
Figure IV.B.1-1 Vicinity Map (27k)
Figure IV.B.1-2 Aerial Photograph
((294k)
Figure IV.B.1-3 Photograph
Location Map (27k)
Figure IV.B.1-4 Existing
Views of the Project Site (157k)
Figure IV.B.1-5 Existing
Views of the Project Site (337k)
Figure IV.B.1-6 Views
of Surrounding Land Uses (160k)
Figure IV.B.1-7 Views
of Surrounding Land Uses (334k)
Figure IV.B.1-8 Views
of Surrounding Land Uses (320k)
Figure IV.B.1-9 Views
of Surrounding Land Uses (155k)
Figure IV.B.1-10 Post Project
View of the Project Site (156k)
Figure IV.B.1-11 Post Project
View of the Project Site (154k)
Figure IV.B.1-12 Post Project
View of the Project Site (189k)
Figure IV.B.1-13 Post Project
View of the Project Site (208k)
Figure IV.B.1-14 Post Project
View of the Project Site (144k)
Figure IV.B.2-1 December Shading
Diagram (54k)
Figure IV.D-1 Liquefaction Map
(311k)
Figure IV.D-2 Regional
Faults and Seismicity (57k)
Figure IV.E-1 Groundwater
Elevations and Direction of Groundwater Flow (140k)
Figure IV.E-2 Location
of MACTEC Projects and Wells in the Project Vicinity (364k)
Figure IV.E-3 Aerial Photograph
(216k)
Figure IV.E-4 Water
Level Elevations in the Deep Zone and Generalized Direction of Groundwater Flow
(206k)
Figure IV.E-5 Elevation
of Water-Table and Generalized Direction of Groundwater Flow (203k)
Figure IV.F-1 Zoning
Designations (101k)
Figure IV.G-1 Noise
Monitoring Locations (267k)
Figure IV.H-1 Site Vicinity Map
(158k)
Figure IV.H-2 Existing
Public Transit Routes (198k)
Figure IV.H-3 Study
Intersection and Street Segments (81k)
Figure IV.H-4 Existing
(2004) Traffic Volumes AM Peak Hour (41k)
Figure IV.H-5 Existing
(2004) Traffic Volumes PM Peak Hour (42k)
Figure IV.H-6 Project
Trip Distribution Percentages (42k)
Figure IV.H-7 Project
Traffic Volumes AM Peak Hour (36k)
Figure IV.H-8 Project
Traffic Volumes PM Peak Hour (36k)
Figure IV.H-9 Future
(2007) Traffic Volumes Without Project AM Peak Hour (39k)
Figure IV.H-10 Future
(2007) Traffic Volumes without Project PM Peak Hour (41k)
Figure IV.H-11 Future
(2007) Traffic Volumes with Project AM Peak Hour (42k)
Figure IV.H-12 Future
(2007) Traffic Volumes with Project PM Peak Hour (42k)